{"id":4015,"date":"2015-11-09T21:19:52","date_gmt":"2015-11-09T18:19:52","guid":{"rendered":"http:\/\/tourism.plus4d.com\/2015\/11\/09\/apc-signs-jd-4-million-agreement-with-ministry-of-water-to-finance-construction-of-wadi-al-wadat-dam\/"},"modified":"2015-11-09T21:19:52","modified_gmt":"2015-11-09T18:19:52","slug":"apc-signs-jd-4-million-agreement-with-ministry-of-water-to-finance-construction-of-wadi-al-wadat-dam","status":"publish","type":"post","link":"https:\/\/www.tourismworld-seyaha.com\/?p=4015","title":{"rendered":"APC signs JD 4 Million Agreement with Ministry of Water to Finance Construction of Wadi Al Wadat Dam"},"content":{"rendered":"<h3 style=\"margin: 25px 0px 1em; padding: 0px 0px 5px; font-size: 1.5em; font-weight: 400; font-family: tahoma; border: 0px; line-height: 1; vertical-align: baseline; color: #111111;\"><span style=\"font-size: 14pt;\">-Minister of Water and Irrigation Dr. Hazem Al-Nasser, and Chairman the Board of Arab Potash Company (APC) Mr. Jamal Al Sarayrah signed an agreement today,&nbsp;Sunday 8\/11\/2015 at the Ministry of Water and Irrigation by which APC would provide four million Dinars to fully finance the construction of Wadi Al Wadat Dam in Tafilah Governorate.<\/span><\/h3>\n<h3 style=\"margin: 25px 0px 1em; padding: 0px 0px 5px; font-size: 1.5em; font-weight: 400; font-family: tahoma; border: 0px; line-height: 1; vertical-align: baseline; color: #111111;\"><span style=\"font-size: 14pt;\">The agreement follows a similar agreement signed in January 2014 to finance the construction of Wadi Ibn Hammad Dam to the value of JD 26 million.<\/span><\/h3>\n<h3 style=\"margin: 25px 0px 1em; padding: 0px 0px 5px; font-size: 1.5em; font-weight: 400; font-family: tahoma; border: 0px; line-height: 1; vertical-align: baseline; color: #111111;\"><span style=\"font-size: 14pt;\">Dr. Al-Nasser stressed at the signing ceremony that \u201cthe Arab Potash Company is one of the Jordan\u2019s leading companies in supporting government and local community organizations in all parts of the Kingdom.\u201d&nbsp; Dr. Al Nasser added that \u201cfinancing the construction of Wadi Al Wadat Dam to the value of JD 4 million by APC comes in response to citizens\u2019 needs in the southern regions for such dams, which will provide water to the people of Tafilah. The minister expressed his pride \u201cat the strategic partnership with the Arab Potash Company, which contributed to many solutions for water challenges facing the South.\u201d<\/span><\/h3>\n<h3 style=\"margin: 25px 0px 1em; padding: 0px 0px 5px; font-size: 1.5em; font-weight: 400; font-family: tahoma; border: 0px; line-height: 1; vertical-align: baseline; color: #111111;\"><span style=\"font-size: 14pt;\">For his part, Mr. Jamal Al Sarayrah said that \u201cfinancing the dam is in line with the vision of His Majesty King Abdullah II Ibn Al Hussein that the first priority is a better life for all Jordanians. &nbsp;Wadi Al Wadat Dam and Wadi Ibn Hammad Dam will provide water for drinking and agriculture to citizens in the largest concentration of pockets of poverty in the Kingdom, and they will address some of APC\u2019s needs for water.\u201d Mr. Al Sarayrah added that APC and the Ministry of Water and Irrigation work continuously to find suitable solutions to the water problem in the south, in the context of APC\u2019s corporate social responsibility (CSR) program.<\/span><\/h3>\n<h3 style=\"margin: 25px 0px 1em; padding: 0px 0px 5px; font-size: 1.5em; font-weight: 400; font-family: tahoma; border: 0px; line-height: 1; vertical-align: baseline; color: #111111;\"><span style=\"font-size: 14pt;\">Construction of Wadi Al Wadat Dam will be carried out in cooperation between the Ministry of Water and Irrigation and the Arab Potash Company, and it is expected to be completed in two to three years, after which rain water will be harvested in the dam at a capacity of 0.5 million cubic meters.<\/span><\/h3>\n","protected":false},"excerpt":{"rendered":"<p>-Minister of Water and Irrigation Dr. Hazem Al-Nasser, and Chairman the Board of Arab Potash Company (APC) Mr. Jamal Al Sarayrah signed an agreement today,&nbsp;Sunday 8\/11\/2015 at the Ministry of Water and Irrigation by which APC would provide four million Dinars to fully finance the construction of Wadi Al Wadat Dam in Tafilah Governorate. The [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[47],"tags":[],"class_list":["post-4015","post","type-post","status-publish","format-standard","hentry","category-47"],"_links":{"self":[{"href":"https:\/\/www.tourismworld-seyaha.com\/index.php?rest_route=\/wp\/v2\/posts\/4015","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tourismworld-seyaha.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tourismworld-seyaha.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tourismworld-seyaha.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tourismworld-seyaha.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4015"}],"version-history":[{"count":0,"href":"https:\/\/www.tourismworld-seyaha.com\/index.php?rest_route=\/wp\/v2\/posts\/4015\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.tourismworld-seyaha.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4015"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tourismworld-seyaha.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4015"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tourismworld-seyaha.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4015"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}